Ongoing Projects -Arka Lupin

We are pleased to announce the launch of our project “ARKA Lupin" situated at Plot No.19, Labour Colony, Pallikaranai, Chennai – 600 100. Please find given below brief details of the ARKA Lupin project and we invite you with family and friends to visit our Project.
We will also happy to brief you about the project and we are also organizing site visit based on your convenience.

PROJECT NAME : ARKA Lupin
PROJECT : 4 Apartments (Partial Stilt + 2 Floors )
PROJECT LOCATION : Plot No. 11&12, Labour Colony,
Pallikaranai Chennai – 100,
1.7 KM from Velacherry Tambaram Main Road
4.5 KM from Velacherry MRTS Railway Station,
Very close to Colleges and Hospitals
BUILT UP AREA : Ranging from 863 Sq. Ft. to 1021 Sq. Ft
PROJECT STATUS : Under Construction – Possession Jan. 2015
PRICE : On Request
SPECIAL FACILITY : a. Gated community
b. Four sides compound wall
c. Sump, Septic Tank & Overhead
PAYMENT SCHEDULE: : At the time of Booking : Rs.2,00,000/-
At the time of Agreement : 10 %
At the time of Registration : 40 %
At the time of Basement : 10 %
At the time of GF Roof : 10 %
At the time of FF Roof : 10 %
At the time of SF Roof : 10 %
At the time of Flooring : 5 %
Before Handed Over : 5 %


Please feel free to contact us anytime for clarification if any. We on our part assure you of our Quality Construction, Customer satisfaction with clear title and approved by all Banks for funding.


View Arka Lupin in a larger map
STRUCTURE: RCC Framed Structure, 9” Brickwork for outer walls.
DOORS: Teakwood Frame with Teakwood panel doors for the Main Entrance. First quality country wood frames with Flush Shutters for all internal doors.
WINDOWS: Country wood frames with Glazed pin type shutters.
FLOORING: 24” X 24” Vitrified Tiles and Skirting with same Tiles.
KITCHEN: a. Polished Black Granite 19mm thick for platform over a RCC Slab with edge nosing.

b. Stainless Steel Sink with drain board with single bowl.

c. Glazed Tiles for walls up to 4’ 0” height above Platform.
BED ROOMS: Bedrooms shall have a space for built in open Wardrobe and open Loft.
BATH ROOMS: Following amenities are provided in each bath rooms :
a. Antiskid Ceramic Tiles for Floors.

b. Glazed Tiles for walls up to 7’ 0” Height.

c. European water closet with slim line water tank with Health Faucet for all bathrooms – White Colour

d. C.P.Fittings and Shower.

e. Wash Basin for all bathrooms – White.

f. Geyser provision for all Bathrooms.
PAINTINGS: a. Asian Ace/Equivalent Exterior Emulsion for outside walls.

b. Asian Tractor Emulsion / Equivalent for inside walls.

c. Enamel paintings for Grills, Doors and Windows.

d. French polishing for the Main Door.
ELECTRICAL: Concealed wiring using PVC conduits recessed switch boards with Modular Switches, three phase power connection with independent meter.
HALL CUM DINING: a. Light - 2 Nos. b. Tube - 2 Nos.

c. Fan - 2 Nos. d.Plug Points-5Ams.–4 Nos.

e. Fridge Point – 1 No. f. Telephone Point – 1 No.

g. T.V. Point - 1 No.
MASTER BEDROOM a. Light - 2 Nos. b. Tube - 1 No.

c. Fan - 1 No. d.Plug Points-5Ams.–2 Nos.

e. Foot Lamp - 1 No. f. Telephone Point – 1 No.

g. T.V. Point - 1 No. h. A/C Point – 1 No.
SECOND BEDROOM: a. Light - 2 Nos. b. Fan - 1 No.

c.Plug Points-5Ams.–2 Nos. d. Foot Lamp – 1 No.

e. A/C Point – 1 No.
BATH ROOMS: a. Light - 2 Nos. b. Plug Points -5Ams.– 1 No.

c. Geyser Point – 1 No. d. Exhaust fan Point– 1 No.
KITCHEN a. Light - 1 No. b. Tube - 1 Nos.

b. Exhaust Fan - 1 No. c.Plug Points-5Ams.–2 Nos.

          - 15 Ams. – 1 No.
SERVICE AREA a. Light - 1 No.

b. Washing Machine Point – 1 No.
WATER SUPPLY Common Bore Well, Overhead Tank and Sump with 12000 liters capacity.
SANITATIONS: All Sanitary waste to be taken through 4” PVC 6 KG pipe to manhole chambers and then to Septic Tank.
OTHERS: All extra work other than given in the standard specification will be done at the extra cost.